Industrial high-level dusting for an active manufacturing facility.



Gentek's manufacturing facility required high-level dust removal from rafters, beams and structural steel that had accumulated dust over an extended period, in an active industrial environment.
Ground-based and powered-access high-level dusting across production and warehouse areas, targeting rafters, beams and overhead structural surfaces.
Work was planned and executed by Working at Heights trained personnel under a pre-work hazard assessment, with controlled work zones maintained throughout.
Camera-mounted equipment was used to visually inspect target areas from the ground and document completed work, giving the facility team full before-and-after visibility.
Before-and-after documentation confirmed removal of accumulated dust from targeted structural surfaces, with camera-based visual verification provided to the facility team.
No ladders, no lifts, no shutdown. Our technician stays at floor level while the pole and vacuum head do the work overhead.
Let's assess your facility and create a plan that works for you.